Solve the parts given in the question using six sigma mini tab tools.

MSE 618- Six Sigma Quality Engineering

Homework # 2 (10 points)

You work for a company that manufactures aluminum rods in the machine shop.  The aluminum rods must be 601 mm +/-4 mm long to meet customer’s specifications. There has been a chronic problem with rods length being out of specifications causing high scrap and rework rates.

For a month, data was collected on the length of 30 aluminum rods in the machine shop. Also, three suppliers A, B and C that manufacture the same part, collected data on 30 aluminum rods at their own facilities (see data below).

Machine Shop

Supplier A

Supplier B

Supplier C

599

602.1

601

603

600

604.0

600.1

601

609

603.7

605.9

601

603

606.4

602.8

600

600

605.7

604

605

601.3

605.3

604

604

601.2

603.2

602

603

600.5

606.9

600

602

601.6

605.5

602.2

602

603

603.7

603.1

599

598.1

604.6

600.2

606

603

603.3

604

600

602.1

606.9

599.9

601

604

605.9

600

603

577.6

603.1

603

600

607

607.7

601.4

605

602

603.3

602.5

604

603

605.3

603.7

604

601.5

604.1

603.9

602

604.6

603.8

602

600

601.1

602.5

600

599

602.5

606.9

607

600

603.1

607.8

609

601

600

605.9

608

602

604.1

604.5

606.3

603

591.7

603.1

605.7

603

589.1

606.1

601.1

607

605.3

602.6

606

601

600.9

604.1

602

603

598.0

603.4

605

604

 

 

Question:

Should the company continue producing aluminum rods or buy parts from outside suppliers? You have been asked to lead a problem-solving team and recommend a solution. Hint:

You must run the following analysis, study results and make a recommendation:

·         Run a normality test for the machine shop and each supplier A, B and C data set

 

·         Perform a Process Capability Analysis for the machine shop, supplier A, B, and C

 

·         Approximate Sigma level for the machine shop, supplier A, B and C (Use

     Cpks)

 

·         Calculate Cp to determine how much the machine shop and each supplier (A, B and C) sample is consuming out of the spec.

 

·         Scrap cost for the machine shop and each supplier A, B and C (Use Taguchi analysis)

 

X

 

·         Run  Â¯Â¯ and R chart for the machine shop, supplier A, B, and C

 

 

 